Past due review

Lift Station 27 Upgrades

The submission deadline passed before review was completed.

Compliance matrix4 checks shown
Field CheckFound ValueStatus
Engineering Firm5engineering; Kalluri Group, Inc.; Consulting Engineering ServicesMeets
Project LocationFriendswood, TXMeets
Fuel TypeReview
Size (kW) + QuantityReview
Send to distributorEvidence packet attached
Distributor assignment has not been synced for this bid yet.
SubjectBlue Star Evidence Packet - Lift Station 27 Upgrades - Due Jul 7, 2026
AttachmentLift Station 27 Upgrades.pdf
[DISTRIBUTOR NAME], We have a bid opportunity in Friendswood, TX that fits your coverage area. Details below. Opportunity: Lift Station 27 Upgrades Contracting Agency: Friendswood, TX Location: Friendswood, TX Due Date: Jul 7, 2026 Key Specs: See attached packet for source-backed specifications The evidence packet is attached as a PDF with the current configuration direction, compliance matrix, and supporting documentation. Let us know if you have questions or need any changes before submitting. Best, [YOUR NAME] Blue Star Power Systems
Copy keeps both HTML and plain text.
Employee review
Review workspace
Loading packet preview...
Review notes
Distributor assignment has not been synced for this bid yet.
Review status
Business bucket
Past due review
Bid value
$0.00
Checks reviewed
0/51 reviewed
Pricing inputs0.48

No defensible Blue Star price is available yet. The submission deadline passed before review was completed.

Found value

$0.00

Configurator/list/base price
$0.00
Active manual adders
$0.00
Reviewed list/base price
$0.00
Distributor net
$0.00
Field checks
51
Add Field Check itemField checks do not change price. Add price impact under Reviewed pricing.
Project Overview3
Engineering Firm

AI5engineering; Kalluri Group, Inc.; Consulting Engineering Services

CSP 2026 -10 Plan Set - Lift Station 7 Upgrades - page 16Kalluri Group, Inc.

CSP 2026 -10 Plan Set - Lift Station 7 Upgrades - page 15engineering

CSP 2026 -10 Plan Set - Lift Station 7 Upgrades - page 12Consulting Engineering Services

Project Location

AIFriendswood, TX

CSP 2026 -10 Plan Set - Lift Station 7 Upgrades - page 115355 BLACKHAWK BLVD.

CSP 2026 -10 Plan Set - Lift Station 7 Upgrades - page 1CITY OF FRIENDSWOOD, TEXAS LIFT STATION No. 27 UPGRADES

Project Application

AILift Station Upgrade (Wastewater)

CSP 2026 -10 Plan Set - Lift Station 7 Upgrades - page 1LIFT STATION No. 27 UPGRADES

Generator Requirements35
Rating Type / Application

AI

No source-backed value found

Fuel TypePricing input

AI

No source-backed value found

Size (kW) + QuantityPricing input

AI

No source-backed value found

Voltage + PhasePricing input

AIphase: 3 · voltage: 480V

CSP 2026 -10 Plan Set - Lift Station 7 Upgrades - page 22PH A

CSP 2026 -10 Plan Set - Lift Station 7 Upgrades - page 23480V

Alternator Rating / Temp Rise

AI

No source-backed value found

Voltage Regulator

AI

No source-backed value found

Generator Space Heater

AI

No source-backed value found

Control Panel

AI

No source-backed value found

Control Panel Options / Accessories

AI

No source-backed value found

Remote Annunciator

AI

No source-backed value found

Enclosure Type + Material

AI

No source-backed value found

Sound Attenuation

AI

No source-backed value found

Enclosure / Auxiliary-Power Accessories

AI

No source-backed value found

Circuit Breaker(s)

AI

No source-backed value found

Generator Circuit Breaker

AI

No source-backed value found

Engine Filters

AI

No source-backed value found

EPSS Class / Level

AI

No source-backed value found

Exhaust Connector End Fittings

AI

No source-backed value found

Generator Control Alarms

AI

No source-backed value found

Generator Breaker Settings / Trip

AI

No source-backed value found

Vibration Isolators

AI

No source-backed value found

Voltage / Frequency Transient Testing

AI

No source-backed value found

Battery Compartment Heater

AI

No source-backed value found

Drawing Generator Rating / One-Line

AIOne-line diagram (E-4, p22): 480V service from pad-mounted transformer through meter disconnect and main service disconnect to ATS; Generator is emergency source connected to ATS; ATS feeds control panel and mini power center (MPC). Load table: PUMP NO.1 30HP 40A, PUMP NO.2 30HP 40A, PUMP NO.3 30HP 40A, MISC POWER & CONTROLS 10KVA 21A; Total load 157A/136A/157A on 200A service. Conduit schedule (E-5, p23): Tag 101 ATS Normal Feeder 480V from main service disconnect to ATS; Tag 102 ATS Emergency Feeder 480V from ATS to Generator; Tag 102A Generator Control 24V from ATS to Generator.

CSP 2026 -10 Plan Set - Lift Station 7 Upgrades - page 22EXISTING EQUIPMENT TO REMAIN.

CSP 2026 -10 Plan Set - Lift Station 7 Upgrades - page 23GENERATOR CONTROL

CSP 2026 -10 Plan Set - Lift Station 7 Upgrades - page 23ATS EMERGENCY FEEDER

One-Line Generator Breaker Ratings (spatially connected main and auxiliary breakers)

AILow peak fuse in disconnect to limit available fault current to less than 10KA. Minimum equipment rating 25KAIC. Service capacity 200A per phase.

CSP 2026 -10 Plan Set - Lift Station 7 Upgrades - page 22MINIMUM EQUIPMENT RATING SHALL BE NO LESS THAN 25KAIC

CSP 2026 -10 Plan Set - Lift Station 7 Upgrades - page 22LOW PEAK FUSE TO BE USED IN DISCONNECT TO LIMIT AVAILABLE FAULT CURRENT ON THE EQUIPMENT TO LESS THAN 10KA.

Jacket Water Heater

AI

No source-backed value found

Exhaust Silencer

AI

No source-backed value found

Battery and Battery Charger

AI

No source-backed value found

Fuel Tank + Accessories

AI

No source-backed value found

Factory Testing

AI

No source-backed value found

Field Quality Control / Site Acceptance

AI

No source-backed value found

Load Bank

AI

No source-backed value found

Switchgear / Paralleling

AI

No source-backed value found

Warranty

AI

No source-backed value found

Generator Overload Capacity

AI

No source-backed value found

ATS Requirements13
ATS Quantity

AIquantity: 1 · required: Yes · instances: tag: — · rating: —

CSP 2026 -10 Plan Set - Lift Station 7 Upgrades - page 21CONTRACTOR SHALL PROVIDE AND INSTALL NEW ATS ON THE EXISTING ELECTRICAL RACK.

CSP 2026 -10 Plan Set - Lift Station 7 Upgrades - page 19EXISTING AUTOMATIC TRANSFER SWITCH (ATS) SHALL BE REMOVED.

ATS Manufacturer / Model

AI

No source-backed value found

ATS Ratings

AI

No source-backed value found

Transition Type

AI

No source-backed value found

Poles / Neutral Configuration

AI

No source-backed value found

ATS Enclosure Type

AI

No source-backed value found

ATS Features / Accessories

AI

No source-backed value found

ATS Transfer Timing

AI

No source-backed value found

ATS Auxiliary Contacts

AI

No source-backed value found

ATS In-Phase Monitor

AI

No source-backed value found

ATS Engine Exerciser

AI

No source-backed value found

ATS Configuration Schedule (every distinct tagged instance kept separate by page/location, with rating, poles, and service rating)

AI

No source-backed value found

ATS Load Sequencing / Shedding

AI

No source-backed value found

Reviewer verdict & notesdraft
Source DocumentsSource Page
PDF
CSP%202026%20-10%20Plan%20Set%20-%20Lift%20Station%207%20Upgrades.pdf